Sedbergh Sports & Leisure Centre

Sector:  Leisure

Contractor:   ISG / Meeks Joinery

Architect:  Darnton B3

Project Size:  69 Doorsets

The Sedbergh Leisure Centre underwent a £17.5 million refurbishment, transforming it into a modern, accessible, and versatile sports and community hub. The two-storey, 5,100 m² facility features a 25m six-lane main pool with a learner/activity pool, an eight-court sports hall, an 80-station gym, dance studios, café, viewing areas, and three upgraded outdoor pitches. Sustainable design elements, a Changing Places facility, and inclusive layouts support accessibility, while high-quality, adaptable spaces encourage participation, social engagement, and health and wellbeing across Bradford.

Design Overview

Doors:

Formica woodgrain laminate doors with exposed ash lipping’s.

Postform PVC wrapped door leaves designed for wet are environment.

Primed door leaves.

Frames / Architraves:

Postform PVC wrapped using Acrovyn 2mm PVC – Wet area design.

Hardwood primed frame with hardwood architrave.

Fire:

FD30s – FD60s.

Acoustic:

40dB.