Brough Leisure Centre
Sector: Leisure
Contractor: Speller Metcalfe / S&A Carpentry
Architect: Roberts Limbrick
Project Size: 43 Doorsets
The Brough Park Leisure Centre, now known as My ACTIVE Leek is undergoing a £17 million refurbishment to modernize and expand its facilities for the community. Upgrades include a 25m six-lane pool with a larger teaching pool, an expanded 60-station gym with new studios, a community wellness suite, indoor soft play, and accessible Changing Places facilities. The all-electric design features air source heat pumps, LED lighting, and solar panels, supporting sustainability. Managed by the Council’s My Active brand as part of Leek town centre’s Levelling Up regeneration, the center will serve as a key hub for physical and mental wellbeing.
Design Overview
Doors:
Formica plain colour laminate doors with exposed ash lipping’s.
Postform PVC wrapped door leaves designed for wet are environment.
Primed door leaves.
Frames / Architraves:
Postform PVC wrapped using Acrovyn 2mm PVC – Wet area design.
Hardwood primed frame with hardwood architrave.
Fire:
FD30s – FD60s.
Acoustic:
30dB.






